In August I started on the reliefs in the workshop of Stadsjutters Almere, where I sawed, sanded and fastened everything together
The reliefs use wood in four colours: natural, ochre, brick red and grey-green. First I worked out which types of wood work well together
The reliefs are inspired by the floor plan of the flat. The corridor is the horizontal main line, the homes are rectangles, and the stairwells and lifts are heavier blocks
The client did not want literal household objects around the photograph, but abstract shapes. The floor plan of the flat became my starting point
I laid out several compositions and compared them before choosing which one would hang next to the photograph
The work hangs in a communal space and therefore has to meet fire class B, a requirement of the housing sector. I had to take that into account while making it
I worked on the reliefs from August to November, in several versions
The wood is all recycled and comes from Stadsjutters Almere
In the first design the work consisted of three photographs of the boy: just starting, placing the last block, and looking at the finished towers. In the end I chose a single photograph: the moment of the last block
An earlier design also included a soundscape, 'Sounds of Home'. It did not make it into the final version
The old photographs date from the early days of the Bijlmer, when the neighbourhood had just been built and the first residents were moving into their flats. That neighbourhood, too, was once new
The children in these old photographs helped make the neighbourhood. Together with the boy, they are the founders of the title
Four days after this photo, on 24 November, the reliefs were hanging in the entrance and the work was finished
I took the photograph of the boy in July. On 18 November the print, on dibond, was installed in the entrance
The work consists of three parts: a photograph in the middle and a wooden relief on either side. The photograph was installed first
The wall measures 6 by 2.5 metres. The photograph and the reliefs were designed together for that one wall
An entrance is used every day. That is why the work had to be durable, resistant to vandalism and easy to maintain
For six days only the photograph hung in the entrance. The reliefs followed on 24 November
The blocks the boy builds with are themselves designed as small apartment buildings. In this way the child playfully makes the new architecture his own
The reliefs were installed on 26 November. With that, Founders was finished
The BRISK project has fixed guidelines for dimensions, fixings and fire safety. The design had to fit within them
On 25 November 1968 the first residents of the Bijlmer received the keys to their flats. Almost 58 years later, on 26 November 2026, this work was finished
Between 1968 and 1975 around 13,000 apartments were completed in the Bijlmer. Now Zuidoost is once again being built up at a rapid pace
This work was made possible by De Alliantie, CBK Zuidoost, Stadsjutters Almere and everyone who helped with the installation